How long does a kitchen renovation take?

The honest answer is that it depends on the scope — but after twenty-plus years of fitting kitchens, I can give you a fair idea.
A straight refit — same layout, new cabinets, worktops and flooring — usually takes one to two weeks once everything is on site. A full renovation where walls, plumbing or electrics move runs more like three to five weeks, because the licensed trades need their turn before I can close anything up.
What slows a job down? Waiting on materials is the big one — cabinets and worktops should be ordered and delivered before anyone picks up a tool. The other is surprises behind the old units: damp, wiring that isn't up to code, a floor that isn't level. A good fitter checks for these at the measure-up, not on day one.
My advice: plan on the kitchen being out of action for the whole fitting period, set up a kettle and a microwave in another room, and be suspicious of anyone who promises a full renovation in a long weekend.
Want a realistic timeline for your kitchen? Get in touch — the free quote includes a proper look at the room and an honest schedule, not a hopeful one.